Western Australia Mine Microgrid

Western Australia

A mine solar and storage microgrid approximately 300km north of Perth.

Key Project Parameters

Location
Approximately 300km north of Perth
Site
Approximately 2,000 hectares, flat terrain
Service load
Approximately 70MW average production load, stated as a 12-hour average
Phase-one connection
33kV connection to the mine’s existing grid
Operating strategy
Storage discharge avoids 16:00–22:00 and covers load in the other periods
System configuration
Solar and storage optimized together
Optimization horizon
15-year whole-life cost
Future phase
Provision for a phase-two wind assessment
Solar resource
Australia’s highest solar-irradiance resource zone

Development Context

Land and site access are largely secured. Final sizing and operation will be confirmed through the latest feasibility study and connection arrangements.